Sourcing Aggregates On Site: A Contractor’s Buying Guide

Getting aggregate supplies for contractors right sounds like the simplest part of a job. Ring the yard, order a few tonne bags, crack on. Then the wrong grade turns up, the sub-base won’t compact properly, and you’re arguing with a supplier while two lads stand around doing nothing.

We’re on both sides of this. We run a yard, and we’re out laying drives and fencing every week ourselves, so we know exactly how much a bad delivery costs a gang. Here’s how to spec and buy aggregates so the material works as hard as your team does.

Know Your Grades Before You Order

Most ordering mistakes come down to asking for a material by the name someone used on a previous site rather than by what it actually is. Worth being precise:

  • MOT Type 1: crushed graded stone with fines, compacts to a solid load-bearing sub-base
  • Type 3: open-graded with the fines screened out, for permeable build-ups and SuDS work
  • Scalpings: cheaper crushed material for haul roads, temporary access and backfill
  • Sharp sand: bedding for paving and screeds, not the same as building sand
  • Building sand: soft sand for mortar, useless as a bedding layer
  • Single-size clean stone: 10mm or 20mm for drainage, soakaways and pipe surround

The permeable jobs catch people out most often. If you spec Type 1 under a permeable surface, the fines block the voids, and the whole build-up stops draining. It has to be a clean, open-graded stone instead. We spec exactly this when we build driveways, so we’ll happily talk it through before you order.

Matching Material To The Load

Depth and grade both need to suit what’s going on top. A footpath doesn’t need what a commercial yard needs, and over-speccing costs money just as surely as under-speccing costs callbacks.

For domestic drives taking cars, a compacted sub-base of roughly 100 mm to 150 mm is typical. Move up to vans or turning traffic and you’ll want more. Soft ground changes things again, and that’s where a geotextile membrane earns its keep by stopping stone punching down into the subgrade.

Compact in layers of around 100mm rather than dumping the lot and hoping the whacker gets through it. It takes longer on paper and saves you a rebuild later.

Plate size matters as well. A light wacker plate will skim over a deep layer and leave it loose underneath, which shows up as settlement six months down the line. Match the plate to the layer depth, and run overlapping passes rather than a single lap around the edges.

Consistency Across Deliveries

On a job running several weeks, material consistency becomes a quiet headache. Decorative gravels in particular vary between batches, and a top-up from a different source rarely blends invisibly into what’s already down.

Where colour matters, order the full quantity in one go and store it properly rather than topping up later. For structural materials the risk is different but still real, because a change in source can mean a change in how the stone compacts and how much you need.

It’s worth asking a supplier whether the same source will be available for the duration of your programme. A straight answer lets you plan.

Bulk Bags, Loose Tipped Or Collected

How you take delivery matters as much as what you order. Each format suits a different kind of site.

Bulk bags are tidy and ideal for tight residential streets where you can’t leave a heap on the road. Loose tipped works out cheaper per tonne once you’re into bigger volumes with room to store it. Collection gives you the most control, especially when you’ve underestimated and need topping up the same day.

Our yard gets restocked every day, which is the whole point of running it the way we do. Traders can turn up, get loaded and be back on site quickly rather than waiting three days on a merchant’s next delivery slot.

Storage, Contamination & Waste

Material left badly on site turns into a cost. Tip clean stone onto bare mud and you’ll lose the bottom of the heap to contamination. A sheet of membrane or a spare board underneath solves it for pennies.

Keep grades separated too. Once Type 1 and clean stone get mixed at the edges, neither is much use for its intended job. Cover decorative aggregates if they’re sitting for a while, because rain washes dust across the surface and the colour goes flat before it’s even laid.

Think about muck away at the same time as delivery. If you’re digging out, a grab hire visit timed for the same day means spoil leaves as new stone arrives, and nobody’s double handling.

Frequently Asked Questions

What’s the difference between Type 1 and Type 3?

Type 1 contains fines and compacts to a dense, solid sub-base. Type 3 has the fines screened out so water can pass through, which is what permeable construction needs.

Can I collect from the yard or do you deliver?

Both. Plenty of trade customers collect for speed, and we deliver when the volume or the site makes that easier.

How much does a bulk bag cover?

As a rough guide, a tonne of MOT Type 1 covers around 10 square metres at 50mm compacted. Always allow a bit extra for uneven ground.

Do you offer trade pricing?

Yes, we run trade deals for landscapers, fencers and builders buying regularly. It’s worth a conversation about your usual volumes.

Buy From A Team That Use The Same Material

We’ve been supplying and installing since 2013, with over 13 years of industry experience behind the team. The advice you get from us comes from laying the stuff, not from reading a product sheet, and our aftercare and support have helped us build a 5.0 star rating from 378 reviews.

If you’d like to talk through a spec for an upcoming job or set up regular trade supply, contact D & J Projects and we’ll sort the details.